A “CNC machining supplier China” search gives you a list of companies. To choose one, ask each to quote the same released drawing and show how it will inspect the features that control fit. Start with the production site’s ISO 9001:2015 certificate, a marked-up drawing and a sample dimensional report.
Which CNC machining supplier China search results belong on the shortlist?
Use the same request for quotation for every candidate. Give each supplier the model, drawing revision, material, finish, quantity and delivery destination. Once a supplier returns a quote, put its answers beside the drawing on your screen. You should be able to trace each critical requirement through the quote to a named production or inspection step. The following checklist gives your purchasing and engineering teams a common basis for comparison.
Сайт MXY Machining company profile describes how drawing review, production and inspection are coordinated.
| Check | Evidence to request | What to compare |
|---|---|---|
| Production certificate | Copy of the certificate covering the order | Site name, address, scope and expiry |
| DFM response | Drawing marked with manufacturing questions | Specific features, reasons and proposed changes |
| First article | Anonymized sample first article report | Drawing revision, features and measured results |
| Routine inspection | Example dimensional report | Coverage of critical features and the agreed measurement method |
| Общение | Named contact and working hours | Who can approve engineering changes and when |
| Confidentiality | Signed NDA before file transfer | Parties covered and handling of revisions |
| Payment | Written payment schedule | Deposit, balance and release conditions |
| Shipping | Named Incoterm and delivery point | Responsibility for freight, clearance and delivery |
| Quality guarantee | Written nonconformance terms | Reporting window and remedy |
| Video factory tour | Walk-through of a representative process | How the work moves from released drawing to inspection |
Whose name should appear on the certificate?
Ask which facility will produce the order. Check the name and address on the certificate against that production site. Read the scope as well as the certificate title. A certificate for an unrelated operation does little to explain how the machining and inspection on your order will be controlled. Keep a copy with the supplier record and note when it expires.
Trace responsibility from drawing release to final inspection. Ask who reviews the drawing, selects the factory, receives the inspection report and owns any corrective action. Parts are produced in ISO 9001:2015 certified facilities. Aerospace parts are produced in AS9100D-certified facilities and medical-device parts in ISO 13485:2016-certified facilities.
What should a DFM response tell the engineer?
Give the supplier a real feature to evaluate. A milled bracket might have a recessed bore that locates a shaft and a deep pocket next to the bore. Ask how the bore will be reached, which surface will locate the part and where inspection will take place. A useful design-for-manufacturability response marks the affected feature on your drawing and explains why its accessibility or location matters. It gives the designer a choice they can approve or reject.
Record the answer against the drawing revision. If engineering accepts a larger internal radius, revise the model and drawing before releasing the purchase order. If the original geometry is essential, ask the supplier to quote it as drawn and identify the proposed operation. An email suggesting a change and a drawing specifying the original geometry leave the machinist without a single approved instruction. The drawing preparation guide explains which requirements belong on the drawing.
What does a sample first article report actually prove?
Request an anonymized first article report and the matching drawing extract. Pick a feature and follow it from the marked drawing to the report. Look for the nominal value, allowable limits, measured result and drawing revision. If inspection treats both sides of a feature as interchangeable, check the datum reference. A clean-looking report cannot resolve a disagreement about which surface controls the fit.
Use a separate line in the quotation to agree on the first article deliverable. Identify who approves it, whether approval releases the production run and what happens to the schedule if the drawing changes. Do they provide design feedback? Will you usually know at what point in the process revisions take place? Follow one drawing feature from sample inspection to the production control plan to find out.
How will you read the production inspection report?
Bring the person who receives the parts into supplier selection. Have them read a sample report with the drawing and say how they would identify the parts, verify a critical feature and record acceptance. Ask which dimensions are checked after coating, how threads are verified and whether the inspection method appears beside the result. If a fixture references a different face from the drawing datum, settle that before machining.

Match the records on the quotation to the checks your receiving team makes. MXY lists its inspection deliverables as follows.
| When supplied | Inspection record |
|---|---|
| Inspection included | Dimensional inspection report of all critical features with every order |
| Inspection on request | First article inspection (AS9102 format), full CMM report, material certificate (EN 10204 3.1), RoHS / REACH declaration, certificate of conformance |
Specify the records you need in the RFQ so they appear on the quotation and can accompany the correct shipment.
Send the drawing revision and requested records with the quotation request.
Who answers questions and approves a change?
Give the supplier one engineering contact for drawing questions and a purchasing contact for order changes. Ask the supplier to identify its counterparts. A production planner may be able to explain when a part will be ready while the designer retains authority over a change to its fit. Write those responsibilities into the order record so an urgent question reaches the person able to decide.
MXY’s operating hours are Monday–Saturday, 8:30–18:00 China Standard Time (UTC+8); email answered within 12 hours. When communicating across time zones, send the marked drawing with the question, the feature reference and your decision deadline together. A discussion that names the datum and drawing revision is easier to resolve than a photograph captioned “please check.”
What belongs in the NDA and commercial comparison?
Complete confidentiality arrangements before transferring proprietary geometry. Establish who may receive files, who will receive later revisions and how the final production version will be identified. Ask how the production team gets the released file and what happens to superseded copies. We sign your NDA, or provide ours, before you send drawings.
Compare payment terms by milestone. A deposit before machining, payment before shipment and customer credit after delivery have different effects on your cash schedule. Write the order currency, payment method, amount and release condition together. Resolve bank charges, freight and the treatment of any tooling while you are comparing quotes, so the purchase order reflects the agreed transaction.
T/T bank transfer, PayPal, Visa and Mastercard. Prototypes and first orders: 100% before production. Production orders and tooling: 50% deposit, 50% before shipment. NET 30 for repeat customers after credit approval.
Which shipping and quality terms belong on the order?
Record the named delivery point with the Incoterm. Ask who arranges collection, supplies clearance documents and handles delivery to your receiving dock. Keep the production lead time and freight transit time on separate lines. A part can be ready for collection on the quoted date and reach the assembly team later. Compare supplier schedules at the same delivery point.
DHL, FedEx and UPS express, 3–5 business days door to door to North America and Europe; air and sea freight for volume orders. Incoterms EXW, FOB Shenzhen, DAP or DDP.
Ask what evidence receiving inspection should retain for a nonconformance. Keep the part identification, released drawing, feature number, measured result and an image of the measurement setup together. Agree on who decides disposition before reworking a rejected part. If parts do not meet the drawing, report it within 30 days of delivery and we remake or rework them free of charge, or refund the affected parts.
What should you ask to see on a video factory tour?
Prepare a short route based on your part. For a turned sleeve, ask to see how material is identified, how the part is located, how the bore is measured and where the result is recorded. There is no need to view another customer’s drawing. An anonymized traveler or sample report can show how a part moves between machining and inspection while keeping the customer’s geometry private.
Follow one handoff carefully. Ask how an operator knows which revision to run and how the inspector retrieves the same revision. If a required finish is applied at another site, ask how the batch and the dimensional requirements travel with it. The manufacturing facilities page gives a starting point for choosing the operations you want to discuss.
Tolerances depend on part size, geometry and material; each Precision or Best tolerance is confirmed feature-by-feature on the quotation together with the inspection method.
Browse the manufacturing guides for related process and material decisions.
How to specify it on your drawing
- Identify the part, drawing revision and model revision. Tell the supplier which file controls dimensions if the model and drawing differ.
- Mark the features that locate, seal or carry load. Identify their datums and the measurement method agreed for acceptance.
- State material grade, finish, masked surfaces and whether a critical dimension applies before or after finishing.
- Name the inspection and material records needed at sample approval and at delivery. Connect each requested record to the part or lot.
- In the RFQ, give prototype and production quantities, destination, delivery point and the person authorized to release production.

How MXY produces CNC machined parts
MXY engineers review every drawing for manufacturability, plan the process route and inspection, and check the finished parts against the released drawing. You deal with one supplier, one quotation and one quality record. Quotes within 24 hours; CNC, sheet metal and 3D printing usually within 12 hours, with DFM feedback included. CNC machining lead times are 3–7 business days for prototypes and 10–15 business days for production. The Standard metal tier is ±0.125 mm (±0.005 in). Send the drawing to the Обработка с ЧПУ.
FAQ
What is a quick way to compare CNC machining suppliers?
Send each supplier the same released model and drawing. Compare the proposed manufacturing route, critical-feature inspection, finishing allowance, documentation, shipping terms and any assumptions. Resolve differences in scope before ranking the quotes by price.
Should the sales company hold the production certificate?
Check the certificate for the site that will make the part. Ask the supplier to identify that site, describe the relationship and show who controls production and inspection. Confirm that the scope covers your ordered work.
Can I send a model without sharing the complete assembly?
Identify which interfaces matter and communicate their functional requirements on the part drawing. Share the geometry the supplier needs to plan machining and measurement. Agree on confidentiality and document any additional assembly data needed for DFM.
Which document should release a production run?
State the release condition in the order. Where the buyer requires first article approval, name the drawing revision, required records and approver. Record acceptance before the supplier proceeds with the agreed production quantity.
What should I keep if an incoming part fails inspection?
Retain the part and lot identification, drawing revision, feature reference, measured result and measurement setup. Send the information to the contact named in the purchase order so both teams investigate the same requirement.