A technical drawing for CNC machining tells the supplier which parts of the model control fit, function and inspection. Send the released solid model with its matching PDF drawing. MXY’s Standard metal tier is ±0.125 mm (±0.005 in). Identify any feature that needs a different tolerance, its datum and how it should be accepted.
What should a technical drawing for CNC machining add to the CAD model?
The model shows nominal shape. The drawing tells the machinist which bore locates the assembly, which face carries load and which dimensions can follow the general tolerance. A buyer who sends a model with every feature modeled to the display precision of the CAD system has conveyed geometry, but has not assigned inspection limits. Put the requirements that would change your acceptance decision on the drawing.
| Drawing item | What the supplier must be able to identify |
|---|---|
| Title block | Part number, drawing revision, units, material grade and general tolerance |
| Datums | The faces or axes used to locate the component in its functional assembly |
| Critical dimensions | The actual fit, relationship or limit that controls acceptance |
| Thread and hole details | Form, size, class, usable thread depth and whether the hole is through or blind |
| Surface condition | Which face has a roughness requirement, its parameter and the measurement stage |
| Finish and masking | Coated surfaces, protected fits and any dimensions that apply before finishing |
| Release record | The matching model revision, authorized changes and documents required with the part |
Which title-block entries affect the quotation?
Use one part identifier consistently across the model, drawing and RFQ. Place the drawing revision where the machinist and inspector can find it without referring to email. Give the units, projection convention and the general tolerance. Name the exact material grade and condition, including a governing product specification where the design requires it. A steel family or an aluminum family can contain several grades with different cutting behavior, finish and properties.
If the component belongs to an assembly, distinguish the part to be quoted from geometry supplied only as a reference. A designer can include a mating shaft to clarify a bore without ordering the shaft. Mark the reference component accordingly. If you need two options quoted, such as a prototype finish and the production finish, give them separate identifiers on the request and keep one approved drawing baseline. That prevents a prototype exception from becoming an undocumented production requirement.
Tolerances depend on part size, geometry and material; each Precision or Best tolerance is confirmed feature-by-feature on the quotation together with the inspection method. Use the quotation request to send the controlled file set. Additional examples of process and material selection appear in the manufacturing guides.
How should I choose datums and geometric controls?
Start from the way the component sits in its assembly. On a mounting bracket, the broad face that seats against a base may establish the primary contact. A locating pin or bore sets another direction, and a stop or fastener controls the remaining degree of freedom. Choose references that can be established on both the production part and the inspection setup. A convenient outer edge is not automatically the face that controls alignment.
Consider a bore that locates a rotating shaft. Its diameter controls the size of the fit. Its location relative to the mounting face controls where the shaft sits. Its orientation relative to that face controls how the shaft runs through the assembly. Put each functional requirement in the appropriate callout. A very tight diameter does not tell the supplier which way the axis must point. The CNC machining tolerances guide compares size, position and form requirements across processes.
Make the inspection setup practical. A datum face interrupted by ribs or a curved outer surface can be difficult to support consistently. If the assembly uses pads or designated points, identify them. If a thin part must be measured in a fixture or in an unclamped condition, show which state controls acceptance. Discuss any proposed change to the datum scheme before issuing the purchase order rather than after the supplier has designed the fixture.

How should I call out a hole or thread?
Start by identifying what enters the hole. A fastener clearance hole, fitted dowel hole and bearing bore have different requirements even when their nominal diameters look similar. Dimension the hole from its functional datum, show whether it is through or blind, and call out any counterbore, countersink or lead-in that matters to assembly. Identify which end of the feature is visible in a sectional detail so the entry direction is clear.
For an internal metric thread, specify the nominal thread, pitch, tolerance class and required usable depth in the drawing units. The MXY milling reference is ISO 965 6H/6g metric, UNC/UNF 2B/2A; M2–M24. Show the drilled-hole depth separately on a blind feature, and leave room for the tool and drill point. Review the section if a nearby passage or thin wall limits the available depth.
Mark which threads are protected during a subsequent finish. A threaded hole accepted after plating or hard anodizing presents a different process task from an uncoated inspection sample. If the assembly uses a particular insert or thread gauge, identify it with the feature. Leave no need for the receiving inspector to infer the thread standard, pitch or class from a simplified representation in the solid model.
What should I put beside the surface finish symbol?
Attach the requirement to the working face. Give the parameter, units and the limit that matters. A sealing land, sliding guide and cosmetic cover do not all need the same surface condition. A prominent note calling for a fine finish everywhere can add polishing and inspection to hidden surfaces without improving the assembly. Mark cosmetic faces separately and provide an appearance reference if color or texture controls approval.
Identify when the surface is measured. A coating can change both the appearance and the size of an interface. Tolerances on drawings apply after finishing unless the drawing says “before finish”. Threads and fits receive masking by default for Type III anodizing, powder coating and plating. A machinist needs to see which dimension applies to bare metal and which to the delivered part. The machining surface finish chart explains why different roughness parameters cannot be freely substituted.
A general edge note can simplify deburring instructions when the drawing identifies edges that need a different treatment. Specify the required break in the drawing units and the faces it applies to. Mark any edge that must remain sharp, a lead-in that needs a defined chamfer or a sealing surface that the deburr operation must preserve. This makes the general note compatible with the local function of a corner.
How do I release a change without mixing revisions?
Send the revised model and the revised drawing together. Record what changed, which revision they supersede and whether the supplier is authorized to continue work already in progress. A changed thread location can affect a fixture, program and inspection plan, even if most geometry appears unchanged. Ask the supplier to identify any work affected before both teams accept the change.
For a first article, connect each critical drawing characteristic to a measured result. Keep the sample identification and test conditions with the revision. Mark whether a deviation is a one-time disposition or a permanent design change. The person reordering parts later should be able to find the released design without reconstructing decisions from a long email chain. Store the accepted drawing, model, quotation and inspection requirements as one release record.
How to specify it on your drawing
- Put the part identity, revision, units, approved material and general tolerance in the title block.
- Show the functional datum scheme, mating interfaces and the individually toleranced features that affect acceptance.
- Give the full thread and hole designations, usable depths, surface symbols and edge notes for the affected features.
- State the finish and masking requirements, and identify exceptions to inspection in the finished condition.
- Connect the drawing to the model revision, requested quantity, inspection documents and shipping requirements on the RFQ.

Which seven items should travel with the RFQ?
Start with the released solid model and the matching drawing. Then give the material grade and condition, the quantities to quote, the finishing and masking requirements, the required inspection or material records, and the destination and delivery requirement. That set lets engineering review the design while purchasing compares the same delivered scope across quotes. For toleranced parts, do not rely on a screenshot of the dimension in a chat message in place of the controlled drawing.
How MXY produces parts from a released drawing
MXY engineers review the released drawing for manufacturability, plan the machining and inspection route, and check the critical features against the drawing. Standard metal dimensions are ±0.125 mm (±0.005 in) and Precision metal features are ±0.025 mm (±0.001 in). CNC prototypes take 3–7 business days and production takes 10–15 business days. Quotes within 24 hours; CNC, sheet metal and 3D printing usually within 12 hours, with DFM feedback included. Submit the model and inspection requirements for custom CNC machined parts.
FAQ
Can I send a STEP file without a drawing?
A solid model communicates nominal geometry. Include a PDF drawing for toleranced parts, especially when fit, datum relationships, threads, finish, masking or a required inspection method affect acceptance. Identify the matching revision on both files.
Which tolerance should appear in the title block?
Give the general tolerance applicable to dimensions without individual callouts. MXY’s defaults are ISO 2768-m for metals and ISO 2768-c for plastics. Put a specific requirement directly on a feature when its function needs a different limit.
Does a blind hole depth also specify full thread depth?
Specify usable thread depth explicitly. The drill depth and space needed below the complete thread can be different. Show the limits imposed by a nearby surface or passage so the supplier can review tool access.
What should I do if the model and drawing disagree?
Identify the affected feature, check which revision was released and resolve the conflict with the design authority. Issue a matched model and drawing or a documented instruction before production relies on the disputed geometry.
How can a buyer make competing quotes comparable?
Send each supplier the same released geometry, material, quantity, finish, inspection requirements and delivery basis. Ask each to identify exceptions and proposed changes separately so the base quotation remains traceable to the design.